Puteytsy railway Hammering crutches
Oil
Canvas on a stretcher
Height 60 cm, width 80 cm
Presence of frame: no
Having a mat: no
Year of creation: 2024
1 092.34
$
Description of the picture
In the picture, a railway lineman performs one of the most labor-intensive operations when repairing a railway. This is the replacement of old wooden sleepers with new ones. At the end of the process, spikes are driven into the new creosote-impregnated sleeper. The shift rate per railway worker is 24 sleepers per 8-hour working day.
Similar works
0 comments